Move offices without an IT scramble on day one

A free, print-friendly checklist that lays out the IT side of an office move week by week, from cabling and wifi to phone porting and the ISP lead times that catch everyone.

A free office move IT checklist for small business. Plan cabling, wifi, firewall, phone porting, and ISP lead times so your new space is ready on day one.

Week by week
timeline from planning to go-live
ISP lead times
the AK and HI trap, flagged early
$0
free, no strings, yours to keep

What you'll get

A practical, ready-to-use resource you fill in with your own numbers and keep. No expiring trial, no strings.

Office Move / New-Build IT Checklist
PDF guide, yours to keep
Preview

What the office move checklist does

An office move looks like a logistics and furniture problem until moving day arrives and nobody can get online. The IT side has a long tail of dependencies, and most of them are invisible until they are missing: the internet circuit that takes weeks to install, the cabling that should have gone in before the carpet, the phone numbers that have to be ported on a schedule.

This checklist makes those dependencies visible early. It walks the IT side of your move week by week, so the slow items get ordered in time and the fast items happen in the right order. The goal is simple: your team walks into the new space, sits down, and works.

A timeline that starts early enough

A T-minus-weeks schedule so the long-lead items, especially internet circuits, get ordered when there is still time, not the week you move.

Cabling and wifi done right

Guidance on structured cabling drops and the cabling category to spec, plus how many wireless access points your square footage actually needs.

Built for Alaska and Hawaii

A note on the shipping and circuit-install lead times that hit island and remote locations, so a hardware delay does not become a closed office.

A go-live and punch list

A cutover checklist for moving day and a post-move punch list, so the small things get caught before they become support tickets.

What is inside the checklist

  • A T-minus-weeks timeline from first planning to go-live
  • Structured cabling guidance, including drop locations and the cabling category to spec
  • A wifi access-point count based on your square footage
  • Firewall and network setup items for the new space
  • Phone porting and VoIP cutover steps, with the timing that keeps your number live
  • ISP install and redundancy lead times, with a note for Alaska and Hawaii shipping
  • A go-live cutover checklist for moving day
  • A post-move punch list to catch the small things

The slow items decide your move date

Internet circuits and special-order hardware set the real timeline, especially out here. Order them first and build the rest of the plan around them. If you want a second set of eyes on your move plan, we are happy to help.

Planning a new office or build-out?

If you are at the early stage and want the bigger picture before you start the checklist, our article on what IT you need when moving to or building out a new office covers the decisions ahead, and our cloud and IT projects hub explains how we run moves and build-outs end to end.

How it works

1

Tell us where to send it

Fill in the short form. Just enough so we know who we're helping and can tailor any follow-up, only if you want it.

2

Check your inbox

We email your copy right away, and the download is yours to keep. No expiring trial, no login.

3

Put it to work

Use it on your own, or ask us for a second set of eyes. No pressure either way.

We do not sell your information

You get the file and an email copy for later. That is it. No third-party sharing, ever.

Real local humans built this

Vicinity is a genuinely local IT provider with people in Alaska and Hawaii who have run real office moves out here.

A working tool, not a brochure

The checklist is something you print and use. Use it whether or not we ever talk.